Aero Pump, Hochheim a. M.
Location:
Hochheim a. M.
Completion:
2022
Aero Pump, Hochheim a. M.
Rheingaubogen 35 site in Hochheim am Main
ZÜBLIN is building an extension in Hochheim am Main on behalf of Aero Pump GmbH, a packaging manufacturer for the pharmaceutical and cosmetics industry .
The extension is divided into a fully automated pallet warehouse, an administration wing and a clean room. Seminar and meeting rooms are located on the top floor.
The project is aiming for DGNB "Sustainable Building Site" certification from the German Sustainable Building Council.
-
Characteristics
- Plot area (GF): 5,850 m²
- Built-up area (BF): 3,250 m²
- Gross cubic capacity (BRI):38,000 m³
- Gross floor area (GFA): 5,700 m²
- Above ground: 3 storeys
- Underground: 1 storey
-
Construction time
- Earthworks and shell construction from July 2021 to February 2022
- Building envelope from December 2021 to March 2022
- Expansion from December 2021
- Overall completion September 2022
-
Construction site regular operation
- Monday to Friday 07:00 to 19:00
- Saturday 07:00 to 15:00
- There is generally no work on Sundays and public holidays.
Certified by the German Sustainable Building Council (DGNB)
Ed. Züblin AG is pursuing several goals with this project: A sustainable construction site organisation, the conservation of resources as well as the minimisation of emissions, responsibility for the health and well-being of the builders, the cultivation of good neighbourliness and, of course, high-quality construction. For this, Ed. Züblin AG was the first company to be recognised by the German Sustainable Building Council (DGNB).
Here you can find more information about the DGNB system for sustainable construction sites: https://www.dgnb.de/en/certification/buildings/construction-site
Selected measures in the project
-
Steel construction
Supporting structures of the production hall made of steel girders. These enable the use of approx. 88% recycled steel, as well as a high degree of prefabrication and reduce the construction time.
-
(Semi)finished parts
Use of façade modules in the form of C-cassettes. These enable rapid assembly thanks to precision-fit production in the factory.
-
Energy-saving lighting
Use of timers for needs-based and energy-saving lighting of the container system. The site lighting in the building is provided by LED spotlights.
| Certification contact person | Dr. Johannes Wall |
| Project contact | Volker Zacharias |
| Construction site address | Rheingaubogen 35 65239 Hochheim am Main Phone +49 6131 304777-10 ZÜBLIN Subdivision Central Secretariat Unit Rhineland-Palatinate |