Am Wingertsgrund
Location:
Frankfurt
Completion:
2024
Am Wingertsgrund, Frankfurt
Location Am Wingertsgrund 15 in Frankfurt am Main
The "Am Wingertsgrund" project in Frankfurt Griesheim involves the construction of three apartment buildings with a total of 67 apartments and an underground garage with 47 double parking spaces.
The excavation pit is secured to the higher border buildings with a back-anchored Berlin shoring. The balconies and stairs are installed as prefabricated parts and the rest of the shell is constructed using in-situ concrete. The façade will be constructed as a composite thermal insulation system with a surrounding base tile. The rental apartments will be finished to a medium standard. Controlled ventilation of the living space is ensured via the six central ventilation units on the flat roof.
The building is being constructed as a passive house.
The project is aiming for DGNB "Sustainable Building Site" certification from the German Sustainable Building Council.
-
Characteristics
- Gross cubic capacity (BRI): 27,904 m³
- Gross floor area (GFA): 8,737 m²
- Above ground: 3-4 storeys
- Underground: 1 storey
- Plot area: approx. 5,400 m²
-
Construction time
- Shell construction work from 02.09.2022 to 01.09.2023
- Expansion work vs. 12.12.2022 to 05.03.2024
- Completion vs. 31.07.2024
-
Construction site regular operation
- Monday to Friday 07:00 to 19:00
- There is generally no work on Saturdays, Sundays and public holidays.
Certified by the German Sustainable Building Council (DGNB)
Ed. Züblin AG is pursuing several goals with this project: A sustainable construction site organisation, the conservation of resources as well as the minimisation of emissions, responsibility for the health and well-being of the builders, the cultivation of good neighbourliness and, of course, high-quality construction. For this, Ed. Züblin AG was the first company to be recognised by the German Sustainable Building Council (DGNB).
Here you can find more information about the DGNB system for sustainable construction sites: https://www.dgnb.de/en/certification/buildings/construction-site
Selected measures in the project
-
Finished parts
The extensive use of precast concrete elements (balcony slabs, balustrades and stairs) means that a shorter construction time can be achieved. The volume of waste is also reduced thanks to the prefabricated orders.
-
Digital concrete call-off
In order to be able to coordinate the concreting in the best possible way, the call-offs are made using a digital application. The delivery rates can be coordinated with the concrete pump, particularly for large-scale concreting, thus reducing the waiting times of the concrete mixers. Production times are optimized and noise emissions are reduced.
-
Saving resources and reducing emissions through LEAN Construction
As part of the lean approach, a production plan with call-off dates (e.g. insulation) was created. Construction production planning is detailed on a weekly basis and adapted to actual production progress. Changes in the construction process are constantly taken into account and just-in-time deliveries can be better implemented. Repeat orders and new orders due to late changes to the plan are avoided.
-
Measures to prevent pollution from the construction site
The project is located in the city center, so the impact of the construction site will be avoided or reduced as much as possible.
-
Energy management in construction
Construction site investigations and comparative considerations for the most energy-efficient project execution possible. For example, selection of a large concrete bucket to reduce the number of lifts.
| Certification contact person | Verena Schirmer |
| Project contact | Murat Ibis |
| Construction site address | Am Wingertsgrund 15 65933 Frankfurt am Main Phone +49 69-60608-1401 ZÜBLIN Subdivision Central Secretariat Unit SF 2 |
| Download | Press release |
| Link | DGNB: Certification |