BioDS, Pfaffenhofen an der Ilm
Location:
Pfaffenhofen an der Ilm
Completion:
2025
BioDS, Pfaffenhofen an der Ilm
Location Luitpoldstraße 1 in Pfaffenhofen an der Ilm
The new Bio-DS production building is being constructed in the northern part of Pfaffenhofen an der Ilm .
The building is planned in the south-east area of the company premises along Ingolstädter Straße. The terrain there has a gradient of approx. 4 m from west to east.
The building has a floor grid of 720 / 720 cm and comprises a gross floor area of 12,080 m² and 5 storeys. The storey heights are 6 m for levels 1 and 2 and 7 m for levels 3+4. Level 5 has a storey height of 7.85 m. Levels 3 and 4 each have a suspended walk-on suspended ceiling in the production area, which separates the clean rooms from the installation areas. For internal access, the building has 3 shaft groups with staircases, elevators and installation shafts for the building services and electrical engineering.
The project is aiming for DGNB "Sustainable Building Site" certification from the German Sustainable Building Council.
-
Characteristics
- Plot area (GF): 2,543 m²
- Developed area (BF): 2,226 m²
- Gross cubic capacity (BRI): 81,194 m³
- Gross floor area (GFA): 12,078 m²
- Above ground: 4 full storeys
- Underground: 1 storey
-
Construction time
- Construction site installation from 04.2024 to 11.2025
- Shell construction work from 07.2024 to 05.2025
- Façade work from 04.2024 to 11.2025
-
Construction site regular operation
- Monday to Friday 07:00 to 18:00
- There is generally no work on Saturdays, Sundays and public holidays.
Certified by the German Sustainable Building Council (DGNB)
Ed. Züblin AG is pursuing several goals with this project: A sustainable construction site organisation, the conservation of resources as well as the minimisation of emissions, responsibility for the health and well-being of the builders, the cultivation of good neighbourliness and, of course, high-quality construction. For this, Ed. Züblin AG was the first company to be recognised by the German Sustainable Building Council (DGNB).
Here you can find more information about the DGNB system for sustainable construction sites: https://www.dgnb.de/en/certification/buildings/construction-site
Selected measures in the project
-
Finished parts
The extensive use of prefabricated parts (filigree slabs, cavity walls, parapets, columns, beams and stairs) means that a shorter construction time can be achieved. The volume of waste is also reduced thanks to the prefabricated orders.
-
Saving resources and reducing emissions through LEAN Construction
As part of the lean approach, a production plan with call-off dates (e.g. insulation) was created. Construction production planning is detailed on a weekly basis and adapted to actual production progress. Changes in the construction process are constantly taken into account and just-in-time deliveries can be better implemented. Repeat orders and new orders due to late changes to the plan are avoided.
-
Savings on transport routes
The sustainability efforts benefit from the nearby concrete supplier. This is located just 300 meters from the construction site. This not only saves travel distances, but also optimizes production times.
-
Measures to prevent pollution from the construction site
The project is located in the city center, so the impact of the construction site will be avoided or reduced as much as possible.
-
Energy management in construction
Construction site investigations and comparative considerations for the most energy-efficient project execution possible. For example, selection of a large concrete bucket to reduce the number of lifts.
| Certification contact person | Valerie Sartorius |
| Project contact | Michael Janker |
| Construction site address | Luitpoldstrasse 1 85276 Pfaffenhofen an der Ilm Phone +49 89 360555-0 ZÜBLIN Subdivision Bavaria Unit Industrial and Civil Engineering |
| Download | Press release |
| Link | DGNB: Certification Client: Environmental protection & sustainability goals | Daiichi Sankyo |