Hebbelschule Wiesbaden
Location:
Wiesbaden
Completion:
2023
Hebbelschule Wiesbaden
Location Raabstraße 2 in Wiesbaden
The construction project comprises the extension of the Hebbel School with a basement and three floors above ground.
Classrooms, a canteen with a food counter and a covered playground on the first floor will be built. The new building is connected to the two existing school buildings of the Hebbelschule and the Dichterviertel middle school.
The project is aiming for DGNB "Sustainable Building Site" certification from the German Sustainable Building Council.
-
Characteristics
- Plot area (GF): approx. 2,500 m²
- Built-up area (BF): approx. 1,300 m²
- Gross cubic capacity (BRI): 21,540 m³
- Gross floor area (GFA): 5,280 m²
- Above ground: 3 storeys
- Underground: 1 storey
-
Construction time
- Shell construction work from March 2023 to December 2023
- Completion -
-
Construction site regular operation
- Monday to Friday 07:00 to 18:00
- Saturday 07:00 am to 12:30 pm
- There is generally no work on Sundays and public holidays.
Certified by the German Sustainable Building Council (DGNB)
Ed. Züblin AG is pursuing several goals with this project: A sustainable construction site organisation, the conservation of resources as well as the minimisation of emissions, responsibility for the health and well-being of the builders, the cultivation of good neighbourliness and, of course, high-quality construction. For this, Ed. Züblin AG was the first company to be recognised by the German Sustainable Building Council (DGNB).
Here you can find more information about the DGNB system for sustainable construction sites: https://www.dgnb.de/en/certification/buildings/construction-site
Selected measures in the project
-
Digital concrete call-off
In order to be able to coordinate the concreting in the best possible way, the call-offs are made using a digital application. The delivery rates can be coordinated with the concrete pump, particularly for large-scale concreting, thus reducing the waiting times of the concrete mixers. Production times are optimized and noise emissions are reduced.
-
Saving resources and reducing emissions through LEAN Construction
As part of the lean approach, a production plan with call-off dates was drawn up. Construction production planning is detailed on a weekly basis and adapted to actual production progress. Changes from the construction process are taken into account on an ongoing basis and just-in-time deliveries can be better implemented. Repeat orders and new orders due to late changes to the plan are avoided.
-
Measures to prevent pollution from the construction site
The project is located in the city center, so the impact of the construction site will be avoided or reduced as much as possible.
-
Energy management in construction
Construction site investigations and comparative considerations for the most energy-efficient project execution possible. For example, selection of a large concrete bucket to reduce the number of lifts.
| Certification contact person | Verena Schirmer |
| Project contact | Patrick Simon |
| Construction site address | Raabstrasse 2 65187 Wiesbaden Phone +49 69-60608-1000 ZÜBLIN Subdivision Central Secretariat Unit RI1 |
| Download | Press release |
| Link | DGNB: Certification |