Neighborhood development Behrensufer
Location:
Berlin
Completion:
-
Neighborhood development Behrensufer
The Peter Behrensbau is the first sub-project to seek "Sustainable Building Site" certification from the German Sustainable Building Council.
-
Characteristics
- Plot area (GF): 2,978 m²
- Built-up area (BF): 1,582 m² rising building components
1,287 m² single-storey underground garage - Gross cubic capacity (BRI): 30,795 m³
- Gross floor area (GFA): 9,933 m²
- Above ground: 6 storeys
(E01-E06 plus staggered storey E07) - Underground: 1 storey
-
Construction site regular operation
- Monday to Friday 07:00 to 19:00
- Saturday as required 07:00 to 15:00
- There is generally no work on Sundays and public holidays.
Certified by the German Sustainable Building Council (DGNB)
Ed. Züblin AG is pursuing several goals with this project: A sustainable construction site organization, the conservation of resources as well as the minimization of emissions, responsibility for the health and well-being of the builders, the cultivation of good neighbourliness and, of course, high-quality construction. For this, Ed. Züblin AG was the first company to be recognized by the German Sustainable Building Council (DGNB).
Here you can find more information about the DGNB system for sustainable construction sites: https://www.dgnb.de/en/certification/buildings/construction-site
Selected measures in the project
-
Concreting
Concreting, for example ceilings, is carried out using a concrete pump, which is continuously filled with concrete by truck mixers and ensures rapid completion of the component thanks to its high performance. Ready-mix concrete is used for concreting. This eliminates dust emissions caused by mixing concrete on site.
-
Reinforcement work
The reinforcement bars installed on the construction site are prefabricated in the factory, i.e. adapted to the exact installation location on the construction site in terms of length and shape, and transported to their respective installation location by building construction cranes. This eliminates noise emissions caused by shaping and adjusting the reinforcement.
-
Saving resources and reducing emissions through LEAN Construction
As part of the lean approach, a production plan with call-off dates (e.g. insulation) was created. Construction production planning is detailed on a weekly basis and adapted to actual production progress. Changes in the construction process are constantly taken into account and just-in-time deliveries can be better implemented. Repeat orders and new orders due to late changes to the plan are avoided.
-
Measures to prevent pollution from the construction site
The project is located in the city center, so the impact of the construction site will be avoided or reduced as far as possible.
-
Energy management in construction
Construction site investigations and comparative considerations for the most energy-efficient project execution possible. For example, selection of a large concrete bucket to reduce the number of lifts.
| Certification contact person | Dr. Johannes Wall |
| Project contact | Patrick Dörre |
| Construction site address | Ostendstrasse 1-4 12459 Berlin Phone +49 30 3553016-0 ZÜBLIN Subdivision North-East Secretariat Brandenburg Unit |
| Download | Press release |
| Link | DGNB: Certification https://be-u.berlin https://www.die.ag |