Office building Weiterstadt
Location:
Weiterstadt
Completion:
2027
Office building Weiterstadt
Location Waldstraße 6-10 in Weiterstadt
The future Group building consists of 3 upper floors. The first floor will be used as offices, while levels 01 and 02 will be used as residential accommodation for the company's own employees.
The existing lightweight hall and a covered storage area will also be extended as part of the new building. The conversion work on the site will be completed with the renovation of the outdoor facilities, including the arrangement of new bicycle parking spaces and new car parking spaces, taking electric mobility into account.
The project is aiming for DGNB "Sustainable Construction Site" certification from the German Sustainable Building Council.
-
Characteristics
- GFA: 1,425 m²
- BRI: 4,813 m³
- Upper floors: 3
- Underground: 1
-
Construction time
- Construction site installation from 08.09.2025 to 12.09.2025
- Demolition work from 08.09.2025 to 05.03.2026
- Shell construction work from 10.11.2025 to 27.03.2026
- Expansion work from 30.03.2025 to 06.06.2027
- Completion planned 27.11.2027
-
Construction site regular operation
- Monday to Friday 07:00 to 18:00
- Saturday 07:00 to 13:00
- There is generally no work on Sundays and public holidays.
Certified by the German Sustainable Building Council (DGNB)
Ed. Züblin AG is pursuing several goals with this project: A sustainable construction site organization, the conservation of resources as well as the minimization of emissions, responsibility for the health and well-being of the builders, the cultivation of good neighbourliness and, of course, high-quality construction. For this, Ed. Züblin AG was the first company to be recognized by the German Sustainable Building Council (DGNB).
Here you can find more information about the DGNB system for sustainable construction sites: https://www.dgnb.de/en/certification/buildings/construction-site
Selected measures in the project
-
Digital concrete call-off
In order to be able to coordinate the concreting in the best possible way, the call-offs are made using a digital application. The delivery rates can be coordinated with the concrete pump, particularly for large-scale concreting, thus reducing the waiting times of the concrete mixers. Production times are optimized and noise emissions are reduced.
-
Saving resources and reducing emissions through LEAN Construction
As part of the lean approach, a production plan with call-off dates (e.g. insulation) was created. Construction production planning is detailed on a weekly basis and adapted to actual production progress. Changes in the construction process are constantly taken into account and just-in-time deliveries can be better implemented. Repeat orders and new orders due to late changes to the plan are avoided.
-
Reuse of demolition material on site
It is planned to crush some of the demolition material on site and use it for the necessary backfilling. This will allow the material to be reused directly on site in line with the circular economy. It also means that transportation of demolition material and earth can be avoided. This reduces CO2 emissions and eases the traffic situation around the construction site.
| Certification contact person | Stefan Kleinfeldt |
| Project contact | Stephan Böhm |
| Construction site address | Waldstrasse 6-10 64331 Weiterstadt Phone +49 60608 - 1401 ZÜBLIN Central Subdivision Secretariat Unit SF2 |
| Download | Press release |
| Link | DGNB: Certification |