Office Campus Deutz 5.BA DÜXX
Location:
Cologne
Completion:
2027
Office Campus Deutz 5.BA DÜXX - Cologne
Location Siegburger Str. 239 in Cologne
The façade has vertical pilaster strips made of precast concrete elements and a parapet cladding made of aluminum sheet, all windows are floor-to-ceiling.
The project is aiming for DGNB "Sustainable Building Site" certification from the German Sustainable Building Council.
-
Characteristics
- Plot area (GF): 3,007 m²
- Gross floor area (GFA): 15,923 m²
- Number of floors: 16 (ground floor + 15 upper floors) and technical floor
-
Construction time
- Construction site installation from week 7 to week 10 2025
- Shell construction work from week 10 2025 to week 18 2026
- Building envelope from calendar week 35 2025 to calendar week 10 2027
- Expansion from week 38 2025 to week 8 2027
- Completion end of February 2027
-
Construction site regular operation
- Monday to Friday 07:00 to 17:00
- Saturday (if required) 07:00 to 13:00
- There is generally no work on Sundays and public holidays.
Certified by the German Sustainable Building Council (DGNB)
Ed. Züblin AG is pursuing several goals with this project: A sustainable construction site organization, the conservation of resources as well as the minimization of emissions, responsibility for the health and well-being of the builders, the cultivation of good neighbourliness and, of course, high-quality construction. For this, Ed. Züblin AG was the first company to be recognized by the German Sustainable Building Council (DGNB).
Here you can find more information about the DGNB system for sustainable construction sites: https://www.dgnb.de/en/certification/buildings/construction-site
Selected measures in the project
-
Digital concrete call-off
In order to be able to coordinate the concreting in the best possible way, the call-offs are made using a digital application. The delivery rates can be coordinated with the concrete pump, particularly for large-scale concreting, thus reducing the waiting times of the concrete mixers. Production times are optimized and noise emissions are reduced.
-
Saving resources and reducing emissions through LEAN Construction
As part of the lean approach, a production plan with call-off dates (e.g. insulation) was created. Construction production planning is detailed on a weekly basis and adapted to actual production progress. Changes in the construction process are constantly taken into account and just-in-time deliveries can be better implemented. Repeat orders and new orders due to late changes to the plan are avoided.
-
Use of renewable energy
The winter construction heating is operated with alternative drive technologies through the use of BKT in the ceilings, i.e. no fossil fuels are used for winter construction heating. The elevators and cranes are powered by renewable energy.
-
Energy management in construction
Construction management studies and comparative considerations for the most energy-efficient project execution possible.
| Certification contact person | Kristina Pors |
| Project contact | Tim Lata |
| Construction site address | Siegburger Str. 239 50679 Cologne Phone +49 221 824 - 2565 Subdivision NRW Cologne-Bonn unit |
| Download | Press release |
| Link | DGNB: Certification |