Quartier Wiesbaden
Location:
Wiesbaden
Completion:
2023
Quartier Wiesbaden
Location Wiesbadener Straße 74 -78 in Wiesbaden (Dotzheim)
The building project comprises the construction of an apartment building complex with 5 houses and 59 apartments as well as a shared underground parking garage in the basement .
By accommodating the parking spaces, it is possible to design the open spaces as green outdoor living areas.
With this project, the city of Wiesbaden plans to create an attractive inner courtyard situation that is protected from traffic noise, to close the gap between the buildings at the junction of Carl-von-Linde-Straße and Wiesbadener Straße and to ensure economical use of land.
The project is aiming for DGNB "Sustainable Building Site" certification from the German Sustainable Building Council.
-
Characteristics
- Plot area (GF): 2,978 m²
- Built-up area (BF): 1,582 m² of rising building components, plus 1,287 m² of single-storey underground garage
- Gross cubic capacity (BRI): 30,795 m³
- Gross floor area (GFA): 9,933 m²
- Above ground: 5 storeys
- Underground: 1 storey
-
Construction time
- Shell construction work from April 2022 to January 2023
- Building envelope from August 2022 to August 2023
- Expansion from November 2022 to October 2023
- Completion October 2023
-
Construction site regular operation
- Monday to Friday 07:00 to 19:00
- Saturday 07:00 to 15:00
- There is generally no work on Sundays and public holidays.
Certified by the German Sustainable Building Council (DGNB)
Ed. Züblin AG is pursuing several goals with this project: A sustainable construction site organisation, the conservation of resources as well as the minimisation of emissions, responsibility for the health and well-being of the builders, the cultivation of good neighbourliness and, of course, high-quality construction. For this, Ed. Züblin AG was the first company to be recognised by the German Sustainable Building Council (DGNB).
Here you can find more information about the DGNB system for sustainable construction sites: https://www.dgnb.de/en/certification/buildings/construction-site
Selected measures in the project
-
Finished parts
The extensive use of prefabricated parts (filigree slabs, cavity walls, parapets, columns, beams and stairs) means that a shorter construction time can be achieved. The volume of waste is also reduced thanks to the prefabricated orders.
-
Digital concrete call-off
In order to be able to coordinate the concreting in the best possible way, the call-offs are made using a digital application. The delivery rates can be coordinated with the concrete pump, particularly for large-scale concreting, thus reducing the waiting times of the concrete mixers. Production times are optimized and noise emissions are reduced.
-
Saving resources and reducing emissions through LEAN Construction
As part of the lean approach, a production plan with call-off dates (e.g. insulation) was created. Construction production planning is detailed on a weekly basis and adapted to actual production progress. Changes in the construction process are constantly taken into account and just-in-time deliveries can be better implemented. Repeat orders and new orders due to late changes to the plan are avoided.
-
Measures to prevent pollution from the construction site
The project is located in the city center, so the impact of the construction site will be avoided or reduced as much as possible.
-
Energy management in construction
Construction site investigations and comparative considerations for the most energy-efficient project execution possible. For example, selection of a large concrete bucket to reduce the number of lifts.
| Certification contact person | Dr. Johannes Wall |
| Project contact | Christoph Kampa |
| Construction site address | Wiesbadener Straße 74 -78, 65197 Wiesbaden (Dotzheim) Phone +49 6131 304777-10 ZÜBLIN Subdivision Central Secretariat Unit Rhineland-Palatinate |
| Download | Press release |
| Link | DGNB: Certification |