Wiesbaden Platinum
Location:
Wiesbaden
Completion:
2023
Wiesbaden Platinum
Location Mainzer Straße 118 in Wiesbaden
The "Platinum" project is being realized in Wiesbaden near the railroad station and A66 freeway junction .
This is an office and administration building that provides up to 300 workstations on 6 floors. The underground car park contains 24 parking spaces and is accessed via a car elevator.
The name "Platinum" refers to the special nature of the project. The aim is to achieve DGNB Platinum certification by constructing the building using a timber hybrid construction method and installing an ice storage system for air conditioning, large-scale photovoltaic systems on the façade and roof surfaces, heating and cooling ceilings and other measures.
The project is aiming for DGNB "Sustainable Building Site" certification from the German Sustainable Building Council.
-
Characteristics
- Plot area (GF): 3,585 m²
- Gross cubic capacity (BRI): 30,620.47 m³
- Gross floor area (GFA): 7,169.35 m²
- Above ground: 6 storeys
- Underground: 1 storey
-
Construction time
- Shell construction work from 01.03.2022 to 20.10.2022
- Building envelope from 15.06.2022 to 22.03.2023
- Expansion from 22.05.2022 to 31.07.2023
- Completion 31.08.2023
-
Construction site regular operation
- Monday to Friday 07:00 to 19:00
- Saturday 07:00 to 15:00
- There is generally no work on Sundays and public holidays.
Certified by the German Sustainable Building Council (DGNB)
Ed. Züblin AG is pursuing several goals with this project: A sustainable construction site organisation, the conservation of resources as well as the minimisation of emissions, responsibility for the health and well-being of the builders, the cultivation of good neighbourliness and, of course, high-quality construction. For this, Ed. Züblin AG was the first company to be recognised by the German Sustainable Building Council (DGNB).
Here you can find more information about the DGNB system for sustainable construction sites: https://www.dgnb.de/en/certification/buildings/construction-site
Selected measures in the project
-
Measures to prevent pollution from the construction site
The project is in a central, inner-city location, so efforts are being made to avoid or reduce the impact of the construction site as much as possible. The concepts for noise and dust avoidance and the protection of soil and groundwater on the construction site are key areas of action. There are also concepts for waste avoidance and an environmentally and resident-oriented logistics concept.
-
Saving resources and reducing emissions through LEAN Construction
Through the consistent use of process planning, the ongoing construction work is synchronized and adapted to the planning specifications. This enables stable and structured work. This is accompanied by an increase in quality through efficient processes. This prevents waste.
Another method is the 5S method for order and cleanliness on the construction site. -
Communication with the local public
The people of Landwasser have played a decisive role in shaping the center since its construction. Accordingly, there are comprehensive reports on the ongoing work in various places.
| Certification contact person | Sarah Jourdan |
| Project contact | Tomas Leizerov |
| Construction site address | Mainzer Street 118 65189 Wiesbaden Phone +49 171 3421272 ZÜBLIN Subdivision Stuttgart |
| Download | Press release |
| Link | DGNB: Certification |