Herrenknecht AG Technology and Innovation Centre
Location:
Schwanau
Build time:
2026 – 2026
Client:
Dr Martin Herrenknecht Verwaltungs GmbH
Herrenknecht AG Technology and Innovation Centre
A technology and innovation centre has been established at Herrenknecht AG’s headquarters in Schwanau, in the Ortenau district, which will in future provide space for the company’s research and development work in the field of tunnel boring technology.
Technology laboratory with distinctive architecture
This architecturally sophisticated building provides modern and flexible spaces for the development of new technologies and solutions for Dr. Martin Herrenknecht Verwaltungs GmbH in Schwanau.
With its striking oval shape and prominent location at the entrance to the factory site, the building also serves as a striking introduction to the building complex. Its distinctive design language shapes the building’s external appearance and, even during the structural work phase, poses particular challenges for its construction.
Precise structural work for a complex building geometry
The construction contract awarded covers the scope of work for the complete construction of the building shell. The distinctive architecture, designed by the architectural practice Singrin GmbH in Lahr, Black Forest, placed high demands on planning, coordination and execution. In particular, the oval shape of the building required precise coordination of the formwork, reinforcement and concrete pouring work. The structural work took place from January to April 2026.
As part of the work, the large-area floor slab and all the rising reinforced concrete walls were constructed. Another distinctive feature of the research and innovation laboratory is the surrounding exposed-concrete balconies. These follow the entire contour of the building, thereby echoing its flowing form.
As the concrete surfaces will remain permanently visible, the quality of the formwork, the concrete mix design, the finish of the edges and a uniform appearance were particularly crucial during construction. The result is high-quality exposed concrete surfaces that emphasise the building’s clean design language and contribute significantly to its distinctive and prestigious appearance.
Hollow-core slabs reduce the amount of material used
The ceiling structure also features a distinctive design element: to reduce resource consumption, modern hollow-core systems have been integrated into the reinforced concrete ceilings. The targeted installation of these hollow-core elements has significantly reduced the structure’s dead weight whilst simultaneously minimising the amount of concrete required.
This optimises not only resource consumption but also the structural framework’s carbon footprint, without compromising on stability, durability or serviceability.
For this project, this solution combines the structural requirements of the framework with a more targeted use of materials. At the same time, the requirements for stability, durability and serviceability of the structural system remain paramount. Particularly in the case of demanding industrial and research buildings, the project demonstrates how architecture, structural engineering and construction can be coordinated.
Successful completion of the structural work
With the completion of our structural work, the Technology and Innovation Centre took on its essential structural form. From the building’s oval geometry to the surrounding exposed-concrete balconies and the hollow-core slabs, the project required precise planning and execution in many areas. The result is the structural shell of an architecturally striking building at the headquarters of Herrenknecht AG in Schwanau, which combines distinctive design requirements with well-thought-out structural solutions.