Debeka Koblenz

Construction logistics in confined spaces.

A modern working environment is being created on Campus 1 of the Debeka head office in Koblenz through extensive refurbishment. Several parts of the building are being completely renovated, including the first floor with foyer, reception, cafeteria and assembly hall as well as a separate part of the building with underground parking, several upper floors and a technical structure. In addition to the renovation of roof areas and building structures, a new staircase will be installed as the first escape route and an additional elevator shaft.

We at ZÜBLIN Baulogistik are responsible for the organization and implementation of the construction logistics on this project. The biggest challenge is the extremely limited space available on the construction site: Every delivery has to be precisely coordinated and timed, as there is no room for long downtimes or alternative options.

Our scope of services in the field of construction logistics

  • Access control and delivery traffic control with traffic lights
  • Establishment and operation of a container village
  • Floor logistics for smooth supply to the individual floors
  • Construction hoists and scaffolding
  • Construction electricity, waste disposal and construction cleaning
  • Winter service and temporary protective measures

With careful planning and close coordination of all processes, we ensure that the renovation of the Debeka Campus runs efficiently and smoothly despite the cramped conditions - and that a modern administrative environment is created for the future.