EnBW Fuel Switch Heilbronn
Location:
Heilbronn
Build time:
2024–2026
Client:
EnBW Energie Baden-Württemberg AG
EnBW Fuel Switch Heilbronn
Through the Fuel Switch Heilbronn project, Ed. Züblin AG’s Stuttgart office is supporting the transformation of one of Baden-Württemberg’s key energy hubs. EnBW’s project aims to gradually transition energy generation from coal to more climate-friendly energy sources and lays the groundwork for future operation using hydrogen. Where the focus will be on modern and more climate-friendly energy generation in the future, ZÜBLIN is laying the structural foundations for the new plant technology.
High-precision industrial construction
The structural work comprises extensive foundation works, operational buildings and numerous civil engineering structures for the future power generation plant. Many of these components form part of the load-bearing structure of process engineering systems, which is why they must be manufactured with the utmost precision.
A particular challenge is the large number of built-in components, anchor points and connections required for the subsequent plant engineering trades. All interfaces are taken into account with millimetre precision right from the structural work stage, so that the subsequent assembly work can be seamlessly integrated.
Building on stilts
A key challenge was the foundation of the structures. Owing to the geological conditions, numerous structures were built on piles. The loads are transferred via pile systems to deeper, load-bearing soil layers.
This construction method required close coordination between specialist civil engineering, structural work and plant engineering. At the same time, the site’s water law requirements had to be consistently taken into account throughout all phases of construction. The close interdependence of the individual work stages made detailed scheduling and implementation planning essential.
Stair tower constructed using the sliding formwork method
A particular highlight of the project is the construction of the stair tower using the sliding formwork method. In this process, the structure grows continuously upwards whilst the formwork is gradually moved upwards. This method enables efficient and, at the same time, extremely precise execution, but places high demands on logistics, concrete pouring and the construction process.
The successful completion of the project impressively demonstrates the experience and technical expertise of those involved in realising complex civil engineering structures under challenging conditions.
Shaping the energy transition together
The Fuel Switch Heilbronn project demonstrates the Stuttgart branch’s expertise in the field of complex industrial and civil engineering projects. With innovative construction methods, high-quality workmanship and a well-coordinated project team, ZÜBLIN is making a significant contribution to creating the infrastructural conditions for a sustainable and future-proof energy supply.
Through complex civil engineering structures and sophisticated structural works, ZÜBLIN is supporting the transformation of the energy infrastructure and playing an active role in shaping the energy transition.