Extension of the Ulm waste-to-energy plant
Location:
Ulm
Build time:
11/2019 - 10/2021
Client:
Donautal Thermal Waste Utilization Association (TAD)
Extension of the Ulm waste-to-energy plant
The existing waste bunker was extended by an additional storage section during ongoing operations.
Special features
Construction of a 10 m cantilevered building section on empty scaffoldingConstruction work during ongoing operationSpecial working conditions with appropriate protective measures.