BF 20 slide rails
Location:
Kappeln, Schleswig-Holstein
Build time:
November 2023 – September 2025
Client:
BPD Immobilienentwicklung GmbH
BF 20 slide rails
With the Schleiterrassen BF 20 (“Mien Anker”) housing development, Ed. ZÜBLIN AG has created a high-quality residential neighbourhood situated directly on the banks of the Schlei. The project combines modern architecture, high-quality craftsmanship and a high standard of living in one of Schleswig-Holstein’s most attractive locations.
In Kappeln, Construction Plot 20 of the Schleiterrassen has given rise to a modern residential complex comprising four buildings and a total of 80 residential units. The buildings are connected via a shared underground car park and blend harmoniously into the development of the new neighbourhood on the Schlei.
Following the successful completion of the neighbouring Plot 19, Ed. ZÜBLIN AG continued to apply its expertise in high-quality residential construction. Attractive flats with a variety of floor plans and living concepts were created across a gross floor area of approximately 9,490 m².
Notable architectural features include the generous ceiling heights of over five metres on the ground floor, additional mezzanine levels and barrier-free floor plans on the upper floors. On the penthouse level, large roof terraces and striking window features ensure a high quality of living and attractive views.
The rounded corners of the building presented a particular technical challenge. Both the structural work and the façade design required the highest level of craftsmanship and precision in execution.
The project’s success is based on close collaboration with the client, BPD Immobilienentwicklung GmbH, and regional partner companies. Thanks to completion on schedule after a 23-month construction period, the residential quarter was successfully handed over to the owners.
With the Schleiterrassen BF 20, Ed. ZÜBLIN AG underlines its capabilities in modern residential construction and its expertise in realising high-quality neighbourhood developments.
-
Construction site camera
-
Key figures
- Site area (GF): 5,732 m²
- Built-up area (BF): 2,187 m²
- Gross internal volume (GIV): 21,553.52 m³
- Gross floor area (GFA): 5,627.51 m²
- Above ground: 3 storeys
- Basement: 1 floor
-
Construction period
- Structural work from January 2024 to September 2024
- Building envelope: July 2024 to February 2025
- Extension works from August 2024 to July 2025
- Completion: August 2025
-
Standard operating procedures for construction sites
- Monday to Friday, 7.00 am to 7.00 pm
- Saturday, 7.00 am to 3.00 pm
- As a rule, no work takes place on Sundays and public holidays.
Certified by the German Sustainable Building Council (DGNB)
Ed. Züblin AG is pursuing several objectives with this project: sustainable site organisation, the conservation of resources and the minimisation of emissions, responsibility for the health and wellbeing of construction workers, fostering good neighbourly relations and, of course, high-quality construction work. For this, Ed. Züblin AG was the first company to receive an award from the German Sustainable Building Council (DGNB).
You can find further information on the DGNB system for sustainable construction sites here: https://www.dgnb-system.de/de/gebaeude/baustelle/
Selected measures within the project
-
Prefabricated components
The extensive use of prefabricated components (delicate ceilings, balconies and staircases) helps to shorten the construction time. Similarly, the volume of waste is reduced thanks to pre-assembled orders.
-
Pump-delivered concrete
Concrete is poured onto larger sections, such as ceilings, using a concrete pump, which is continuously supplied with concrete by mobile mixers and, thanks to its high capacity, ensures that the structural element is completed quickly. The short duration and high capacity of the process mean that noise and dust pollution can be significantly reduced.
-
Resource conservation and emissions reduction through LEAN Construction
As part of the lean approach, a production plan with call-off dates (e.g. insulation) was drawn up. Construction production planning is detailed on a weekly basis and adjusted to reflect actual production progress. Changes arising from the construction process are taken into account on an ongoing basis, enabling just-in-time deliveries to be implemented more effectively. This avoids the need for repeat or new orders resulting from subsequent changes to the plan.
-
Energy management in the construction industry
Construction-related studies and comparative analyses aimed at ensuring the project is carried out in the most energy-efficient manner possible. For example, selecting a large concrete bucket to reduce the number of lifts.
| Certification contact person | Britta Nordmeyer |
| Project contact | Frank Löwenstrom |
| Construction site address | Lindaunis-Weg 3 24376 Kappeln Tel. +49 40 20208-1421 ZÜBLIN Northern Regional Office Secretariat for the Hamburg/Schleswig-Holstein region |
| Download | Press release |
| Link | DGNB: Certification New-build and construction project in Kappeln > MienAnker |