Struenseestrasse School Campus
Location:
Hamburg Altona
Completion:
2025
Struenseestraße School Campus in Hamburg Altona
Location Struenseestraße 20-32 in Hamburg
The Struenseestraße school campus is being built between Königstraße and Struenseestraße. The construction project comprises the erection of four buildings.
These include three schools, the Struensee-Gymnasium, the Deutsch-Französisches Gymnasium and the all-day school on the Elbe, as well as two-storey single and three-court gymnasiums. In total, over 2,000 pupils will attend the three schools.
The Otto Wulff and Ed. Züblin AG consortium has been commissioned as general contractor for the construction.
The project is aiming for DGNB "Sustainable Building Site" certification from the German Sustainable Building Council.
-
Characteristics
- Plot area (GF): 28,500 m²
- Developed area (BF): 7,444 m²
- Gross cubic capacity (BRI): 136,772 m³
- Gross floor area (GFA): 29,335 m²
- Above ground: 4 storeys
- Underground: 1 storey
-
Construction time
- Shell construction work from August 2023 to August 2024
- Building envelope from January 2024 to January 2025
- Expansion from January 2024 to March 2025
- Outdoor facilities from May 2024 to April 2025
- Completion May 2025
-
Construction site regular operation
- Monday to Friday 07:00 to 19:00
- Saturday 07:00 to 15:00
- There is generally no work on Sundays and public holidays.
Certified by the German Sustainable Building Council (DGNB)
Ed. Züblin AG is pursuing several goals with this project: A sustainable construction site organisation, the conservation of resources as well as the minimisation of emissions, responsibility for the health and well-being of the builders, the cultivation of good neighbourliness and, of course, high-quality construction. For this, Ed. Züblin AG was the first company to be recognised by the German Sustainable Building Council (DGNB).
Here you can find more information about the DGNB system for sustainable construction sites: https://www.dgnb.de/en/certification/buildings/construction-site
Selected measures in the project
-
Measures to prevent pollution from the construction site
Various concepts, including noise and dust avoidance and logistics, are used to minimize the impact on residents. A waste avoidance concept also ensures that as much material as possible is recycled.
-
Personnel
An employee of the general contractor monitors compliance with the sustainability concepts and trains the subcontractors.
-
Finished parts
The extensive use of prefabricated parts (filigree slabs, cavity walls, parapets, columns, beams and stairs) means that a shorter construction time can be achieved. The volume of waste is also reduced thanks to the prefabricated orders.
-
Saving resources and reducing emissions through LEAN Construction
As part of the lean approach, a production plan with call-off dates (e.g. insulation) was created. Construction production planning is detailed on a weekly basis and adapted to actual production progress. Changes from the construction process are taken into account on an ongoing basis and just-in-time deliveries can be better implemented.
| Certification contact person | Kai Zimmermann |
| Project contact | Sabine Detlefsen |
| Construction site address | Struenseestrasse 20-32 22767 Hamburg Phone +49 40 20208-1001 Züblin Subdivision North Assistant to the Unit management SF Hamburg, Mecklenburg-Western Pomerania |
| Download | Press release |
| Link | DGNB: Certification School building Hamburg |